Facebook

Bridge opening on Memorial Drive pushed into late May

<< Back to article

A 10-foot concrete culvert is replacing the 96-inch drainage pipe, left, that collapsed last August.
 

Jim Fair

A 10-foot concrete culvert is replacing the 96-inch drainage pipe, left, that collapsed last August.

 

Share on Facebook    |     Share on Twitter    |     Share on LinkedIn

More photos from this article

Leave a Comment



Trending: Greenville-Spartanburg International Airport, Obituaries, Chon Restaurant, Allen Bennett Hospital

GREER CALENDAR

View All Events