Facebook

CPW work at port nearly complete, city to address truck traffic ordinance

<< Back to article

The operations left, and maintenance buildings are under construction. A 3-lane truck wash will be at the left of the maintenance building.

Bruce Fallon / Greer CPW

The operations left, and maintenance buildings are under construction. A 3-lane truck wash will be at the left of the maintenance building.

Share on Facebook    |     Share on Twitter    |     Share on LinkedIn

More photos from this article

Leave a Comment



Trending: Greenville-Spartanburg International Airport, Obituaries, Chon Restaurant, Allen Bennett Hospital

GREER CALENDAR

View All Events