Pacing operations will occur on Saturday and Sunday in support of blasting operation needed as part of the 85-385 Gateway Project.
Pacing operations are scheduled for Saturday morning 7 and 11 a.m. and Sunday morning between 7 a.m. to noon.
As part of the operation, Highway Patrol troopers will be pacing drivers along I-385 North, I-385 South and both lanes of Woodruff Road. There will be multiple paces each day.